- Rainwater is collected from the roof and stored for use in toilets and steam production. Site run-off water is collected in dams with reed-bed filtration systems and used to maintain the landscaped gardens.
- The facility is surrounded by extensive plantings of trees, grasses and shrubs.
- ABR installed a new filtration system in June 2023, a dual HR7120 RO system that produce a combined 240l/hour
- The monthly water savings is approx. 8000L/ month or 93000L/year.
ABR April holiday deliveries
The ABR shuttle van does not operate on Public Holidays.